One Central DHA Lahore’s Smart Flood Control System

One Central DHA Lahore is nearing completion, delivering modern master‑planning and high‑standard infrastructure.

The project dedicates 27 % of its area to open spaces and provides wide pedestrian pathways that promote walkability and easy movement throughout the community.

An integrated smart network underpins the development, streamlining operations and enhancing oversight of utilities and services.

Flood mitigation is a core focus, with a rainwater harvesting system designed to capture, store, and manage monsoon runoff.

  1. Surface Run‑Off Collection: Rainfall generates surface run‑off that is quickly captured by an extensive network of storm‑water drains, preventing water buildup on streets and walkways.
  2. Diversion to Harvesting Tank: Collected water flows from the drainage lines into an on‑site storage tank, centralising excess runoff for controlled handling.
  3. Power and Pumping Activation: Dedicated generators and Variable Frequency Drives (VFD) supply electricity to heavy‑duty pumps, which draw water from the tank when needed.
  4. Controlled Water Discharge: The pumped water is released into the Rohi Nala / Charrar Drain, efficiently disposing of surplus without affecting local roads.

Through this coordinated rainwater harvesting and drainage cycle, One Central DHA Lahore actively reduces flood risk and protects community infrastructure under varied weather conditions.

Contact information Name: Choudry Mujahid Yasin ( CMY ) Phone: +923224929992 Whatsapp Available